Duffers : New Build
This new build was designed in 2015 and the build completed in 2016. The design needed to respond to an unusual site with distant view, south facing facade and main access all on the same elevation.























This new build was designed in 2015 and the build completed in 2016. The design needed to respond to an unusual site with distant view, south facing facade and main access all on the same elevation.